Categories | Fence Mesh Welding Machine |
---|---|
Brand Name: | DIAOZHUO |
Model Number: | DZ2000 DZ2500 DZ3000 |
Certification: | CE ISO9001 |
Place of Origin: | HEBEI, CHINA |
MOQ: | 1set |
Price: | variable |
Payment Terms: | L/C, D/P, T/T |
Supply Ability: | 10 sets per month |
Delivery Time: | 20-30 days |
Packaging Details: | woodencase and plastic bags |
material: | steel welding |
control: | PLC automatic prenmatic |
line wire: | pre-cut by machine |
cross wire feeding: | pre-cut |
engineer: | available to service machinery overseas |
product name: | reinforcing mesh welding machine |
Pneumatic Reinforced Rebar Mesh Welding Machine
machine details:
Technical items | Parameters | Parameters | |
Wire diameter | 5-12mm | 5-12mm | |
Cross wire space | 100--300mm | 100-300mm | |
Line wire space | 50--200mm | 50-200mm | |
Number of electrodes | 24 | 30 | |
Max. mesh width | 2500mm | 3000mm | |
Mesh length | 3000 -12000mm | 3000-12000mm | |
Rated power | 120kvax12 | 120kvax15 | |
Welding speed | 30-50 times/min | 30-50 times/min | |
Weight | 7.5t | 9.5t | |
Overall dimension | 24x6.0x2.65m | 24x6.5x2.65m | |
Cross wire form | pre-cut wire | pre-cut wire | |
Line wire form | pre-cut wire | pre-cut wire | |
Welding transformer | with water cooling system | with water cooling system | |
Mesh pulling way | Controlled by PLC | Controlled by PLC | |
Cross wire feeding way | Automatic falling ,one by one | automatic falling,one by one | |
Material | low carbon steel wire, galvanized wire or ribbed wire | Low carbon steel wire, galvanized wire or ribbed wire |
machine advantage
Panasonic, Schneider, ABB, SMC, Igus electric components.
Touch screen interface.
Pre-straightened & pre-cut wires.
PLC control of cross wire space adjustment and welding current
adjustment.
Panasonic servo motor for mesh pulling.
Pure welding electrodes, 30*30*30mm (3-8mm), 30*30*50mm (5-12mm).
Cooling system: cast water-cooling transformer and lower welding
electrode base.
Brake motor & reducer connect the principal axis directly.
Wire pre-load system.
After-sale service
1. If the buyers need, we can send our technical staff to the buyers factory to install the machine and providing the training in 30 days after the machines arrived the destination port
2. Maintenance period :3 year for whole machine except vulnerable parts
3. The numbers of technical persons:one technical per machine
4. The fees: the buyer have to pay the technical salary 100 USD per day, and the round-trip ticket, accommodation and other related fees.
During the maintenance period , if the parts are broken caused by the product problem, seller will offer the parts for free, if you need we assign the technicians to your factory, then you will pay some related fees.