Categories | Coal Fired Steam Boiler |
---|---|
Brand Name: | YONGXING |
Model Number: | DZH |
Certification: | ISO9001,ISO14001,SGS,BV |
Place of Origin: | HENAN |
MOQ: | 1set |
Price: | negotiable |
Payment Terms: | T/T, L/C, Western Union |
Supply Ability: | USD1000/SET |
Delivery Time: | 10-15days |
Packaging Details: | Nude packing |
Type: | DZL/SZL type |
Standard: | GB ,ASME |
Capacity: | 0.5 ton,1 ton, 2 ton, 4 ton, 6 ton |
Color: | Gray,Red,Brown,White,Golden |
Structure: | Water Tube |
Medium: | Steam |
Circulation: | Water circulation |
Output: | Steam |
Company Info. |
Yong Xing Boiler Group Co.,Ltd |
View Contact Details |
Product List |
DZH 0.5-6 ton Coal Fired Steam Boiler For food Industry and Pharmaceutical Industry
Feature
1. The coal Fired Steam Boiler adopt single drum, layer arrangement, compact structure, sufficient output, safe and reliable operation, short construction period, and low installation cost etc.
2. It adopts automatic operation chain grate, water tube structure
which ensures boiler safe operation and extend service life.
3. The design of cyclone re-burning chamber in furnace resulted in
the decrease of dust contained in the flue gas. At the same time,
incandescent carbon black particles shall burn further, enhancing
the boiler thermal efficiency,and decreasing gas blackness, as a
result, the gas emission concentration shall meet the requirements
of grade A environmental protection area.
4. The grate employ the technology patent of small roller
structure, boundary grate and so on, improving the operation
reliability of the boiler.
5. Since the adoption of technology patent for the sealed wind
chamber and bilateral grate air register, and the application of
machining cone seal structure to grate adjusting air equipment, the
sensitivity of the grate shall be improved.
6. According to the customers' requirements, other energy saving
equipment, shall be matched.
Data sheet 1
Item No. | DZH0.5-0.7 | DZH1-1.0 | DZH1-1.25 | DZH2-1.0 | DZH2-1.25 | DZH4-1.25 | DZH4-1.6 | DZH6-1.25 |
Rated steam output(t/h) | 0.5 | 1 | 1 | 2 | 2 | 4 | 4 | 6 |
Rated work pressure(Mpa) | 0.7 | 1 | 1.25 | 1 | 1.25 | 1.25 | 1.6 | 1.25 |
Rated steam temperature(°C) | 165.3 | 184 | 194 | 184 | 194 | 194 | 204 | 194 |
Rated feed water temperature(°C) | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 |
Thermal efficiency(%) | 76.6 | 77.18 | 77.6 | 76.8 | 77.7 | 78.8 | 78.8 | 78.5 |
Fuel consumption (kg/h) | 79 | 172 | 178 | 358 | 361 | 726 | 732 | 1080 |
Shipping size(m) | 3.67* 1.76* 2.78 | 4.31* 1.9* 2.86 | 4.31 *1.9* 2.85 | 5.41 *2.6* 3.1 | 5.41 *2.6* 3.26 | 5.86 *2.8* 3.39 | 5.86 *2.8* 3.4 | 6.2* 2.96* 3.58 |
Data sheet 2
Coal-fired steam boiler configuration list | |||
Number | Type | Parts | Quality |
1 | YCWS8147-00-0 | Smoke duct | 1 |
2 | YCWS8147-01-0 | Blower outlet takeover | 1 |
3 | YCWS8147-07-0 | Induced draft fan inlet nozzle (including size head) | 1 |
4 | YCWS8147-08-0 | Induced draft fan outlet takeover | 40 m |
5 | 6X52 | Asbestos belt | 254 |
6 | GB5781-86 | Bolt M10*30 | 254 |
7 | GB6170-86 | Nut M10 | 8 |
8 | GB799-86 | Anchor bolt M20*400 | 8 |
9 | GB6170-86 | Nut M20 | 1 |
10 | 9-19№10D Left 135° | Induced draft fan Motor power: 37KW | 1 |
11 | G6-45-11№7.1A Right0° | Blower Motor power: 7.5KW | 1 |
12 | ZLX-6 | Spiral slag machine | 1 |
13 | ZGS-6 | Coal machine (including parts) | 1 |
14 | XBT-6 | Speed control box Motor power: 3KW | 1 |
15 | JGGC8-200/25 | Makeup pump motor power: 11KW | 1 |
16 | DX-6 | Electrical control cabinet (including high and low water level alarm) | 1 |
17 | Automatic | Water treatment | 1 |
18 | matching | Sub-cylinder | 1 |
19 | matching | Dust collector | 1 |
20 | matching | Chimney | 1 set |
21 | YCWS8253-00-0 | Boiler master drawing | 1 set |
22 | YCWS8255-00-0 | Boiler body draeing | 1 set |
23 | YCWS8351-00-0 | Boiler instrument valve drawing | 1 set |
24 | YCWS8258-00-0 | Boiler foundation drawing | 1 set |
AFTER-SALE SERVICE
1. Offer lifelong door - to - door after sale service and quarterly
visiting if possible.
2. 12 months warranty period, if boiler body or accessories are
damaged under proper operation, Yongxing boiler will maintenance or
replace the damaged accessories for free (except spare parts).
3. 12 hours service hot-line, offer proper solutions to solve the
problems happened during operation.
Kindly Send us your inquiry by website or by mailbox.