Categories | Raised Access Floor Tiles |
---|---|
Brand Name: | PARETE |
Model Number: | C4 |
Certification: | ISO, CISCA, SGS |
Place of Origin: | China |
MOQ: | 100 |
Price: | negotiated price |
Payment Terms: | Western Union, T/T, L/C |
Supply Ability: | 200000 |
Delivery Time: | 2 weeks |
Packaging Details: | Plywwod pallet, corner protection, membrane package, marking; |
Other Name: | Office Raised Flooring |
Size: | 500*500*28 mm |
Color: | Grey bare finish |
Loading capacity: | concentrated loading 662 lb ~ 1250 lb |
Feature: | Fast installation |
Casino environment
Lay a foundation for a space that is smarter, more flexible, and sustainable that is ideal for casinos — an environment that requires strong and quiet access flooring.
The exposed concrete surface offers a unique aesthetic that is beautiful enough to leave bare, or covered with modular carpet, you choose. Either way, you get a surface that feels rock solid underfoot, unlike ordinary steel access floors.
So we can list common characters of casino environment as following:
∆ Gambling machines are heavy duty, high density layout, update or maintenance frequently.
∆ Cabling and wiring systems are complicated. Need to allow freedom to access wiring and cabling quickly and easily. Repositioning and update will be frequent required.
∆ Some area have high requirements of the rolling capacity. For example, some high floor level is required scissor lift to maintain ceiling or lighting.
∆ Large flow of people are moving frequently in the casino. Need to improve indoor air quality to provide enjoyable environment for patrons.
∆ Gambling facilities are in long-time operating . Need to reduce the heating of facilities.
∆ The gambling environment are full of humans voice and data systems noise. Need to reduce the noise to provide the healthy environment for patrons.
∆ Most of the casinos are open one area by one area to improved the max. return of investment.
Advantages of Parete Raised Floor in Casino
Cabling management solution for gambling facilities
In casinos, gambling equipment and surveillance systems are upgraded continuously. Historical covered trenches in concrete to run the cabling on the gambling floor are not flexible; minor additions or space revisions result in major costs and disruption.
Easy maintenance gambling equipment
Gambling equipment and surveillance systems are upgraded continuously. Simply remove the floor tile, and lift the channel
plates; new wires are installed in seconds instead of hours!
High loading capacity performance and long life time
Casino project use 2000 lb concentrated loading raised floor system. It can support the high density population, gambling machine, relative facilities, and rolling capacity of scissor lift for maintenance.
High cable capacity
The height of the pedestal can be custom ordered and adjusted so that the cable can be laid according to the design requirements to support the wires for the slot machines, gaming tables and security wiring.
Great flexibility with minimum downtime
Renovate your existing casino facility without shutting down your operation. Parete raised floor is ideal for installing in phases,
without noise, fumes, dust or debris…no disruption, allowing the rest of the facility to remain ‘open for business’.
Easy installation and fast the project progress
Parete raised floor is very easy to install. The work is easy to manage, so that it can shorten the project time.
Type | Size | Concentrated load | Impact resistant load (N) | Ultimate load (N) | Uniform distributed load | Rolling road (N) | |||
No | LB | N | KG | 10 times | 10000 times | ||||
PRT-OA-C4-G662 | 600×600×33 | ≥662 | ≥2950 | ≥301 | ≥445 | ≥8850 | ≥12500 | 2214 | 1545 |
PRT-OA-C4-G800 | 600×600×33 | ≥800 | ≥3550 | ≥363 | ≥670 | ≥11250 | ≥16100 | 2946 | 2356 |
PRT-OA-C4-G1000 | 600×600×33 | ≥1000 | ≥4450 | ≥453 | ≥670 | ≥13350 | ≥23000 | 3560 | 2670 |
PRT-OA-C4-G1250 | 600×600×33 | ≥1250 | ≥5560 | ≥567 | ≥670 | ≥16680 | ≥33000 | 4450 | 3560 |
PRT-OA-C4-G1500 | 600×600×35 | ≥1500 | ≥6665 | ≥680 | ≥670 | ≥19995 | ≥39324 | 5560 | 4450 |
PRT-OA-C4-G2000 | 600×600×35 | ≥2000 | ≥9000 | ≥910 | ≥670 | ≥31130 | ≥58000 | 6697 | 5596 |
Philippine Casino raised floor
Macau Casino raised floor
Macau Casino raised floor platform
Macau Casino raised floor platform
Some of the Project References List
Project name | Model/Panel Size (mm) | Thickness | Core Material | Area(m*m) | Application Field |
Guangzhou Baiyun Airport | FS1000 600*600 | 35mm | Steel infill with cement | 13000 | Office,Control Center,Server Room |
Guangzhou International Financial Center | FS1000 600*600 | 35mm | Steel infill with cement | 22500 | Office |
Guangzhou Opera House | FS1000 600*600 | 35mm | Steel infill with cement | 3700 | Office,Control Center |
Guangzhou TaiKoo Hui | FS662 600*600 | 30mm | Calcium sulphate | 3000 | Office |
Guangzhou Vanlas Fort Hotel Office | FS662 600*600 | 33mm | Steel infill with cement | 20000 | Office |
Guangzhou media port | FS1000 600*600 | 35mm | Steel infill with cement | 12500 | Office,Control Center,Server Room |
Guangzhou Tianhe No.2 super computer | FS1250 600*600 | 35mm | Steel infill with cement | 7820 | Server Room |
Guangzhou Nansha Toyota | FS1000 600*600 | 35mm | Steel infill with cement | 3900 | Office,Control Center,Server Room |
Guangzhou Times Property E-park | FS662 600*600 | 28mm | Steel infill with cement | 55000 | Office |
Guangzhou Panyu China Mobile | FS1250 600*600 | 32mm | Calcium sulphate | 3200 | Server Room |
Guangzhou Modern Plaza | FS662 600*600 | 33mm | Steel infill with cement | 20000 | Office |
Guangzhou Fedex Transition Center | FS1000 600*600 | 33mm | Steel infill with cement | 4800 | Office,Control Center,Data Center |
Guangzhou tax plaza | FS1000 600*600 | 35mm | Steel infill with cement | 12900 | Data Center |
Guangzhou Museum | FS1000 600*600 | 35mm | Steel infill with cement | 2400 | Data Center |
Guangzhou C&F Science Plaza | FS662 600*600 | 35mm | Steel infill with cement | 13800 | Office |
Guangzhou Baiyun Conference Center | FS1000 600*600 | 35mm | Steel infill with cement | 3500 | Office,Control Center |
Shenzhen Kade No.1 Park | FS662 500*500 | 28mm | Steel infill with cement | 15000 | Office |
Shenzhen Pingan Plaza | FS662 600*600 | 35mm | Steel infill with cement | 2000 | Office,Data Center |
Shenzhen Baili Plaza | FS662 600*600 | 33mm | Steel infill with cement | 30000 | Office |
Shenzhen Qianhai Times Plaza | FS662 500*500 | 28mm | Steel infill with cement | 10000 | Office |
Shenzhen New Huafu | FS662 600*600 | 35mm | Steel infill with cement | 10000 | Office |
China Mobile (Guangdong branch) | FS1250 600*600 | 35mm | Calcium sulphate | 10000 | Server Room |
China Mobile (GuangXi branch) | FS1000 600*600 | 35mm | Steel infill with cement | 30000 | Server Room |
China Mobile (Tanshan branch) | FS1250 600*600 | 35mm | Calcium sulphate | 800 | Server Room |
China Mobile (Sichuan branch) | FS1000 600*600 | 35mm | Steel infill with cement | 700 | Server Room |
China Mobile (Quanzhou branch) | FS1000 600*600 | 35mm | Steel infill with cement | 1600 | Server Room |
China Mobile (NingXia branch) | FS1000 600*600 | 35mm | Steel infill with cement | 1200 | Server Room |
China Mobile (Hebei branch) | FS1000 600*600 | 35mm | Steel infill with cement | 1000 | Server Room |
China Mobile (Liaoning branch) | FS1000 600*600 | 32mm | Steel infill with cement | 25000 | Server Room |
China Mobile (Jiangxi branch) | FS1250 600*600 | 35mm | Calcium sulphate | 1200 | Server Room |
China Mobile (Hunan branch) | FS1250 600*600 | 32mm | Calcium sulphate | 26700 | Server Room |
China Mobile (Guizhou branch) | FS1000 600*600 | 35mm | Steel infill with cement | 1200 | Server Room |
China Mobile (South Center in Guangzhou) | FS1000 600*600 | 35mm | Steel infill with cement | 13043 | Server Room |
Huizhou Kaisa Commercial building | FS662 600*600 | 35mm | Steel infill with cement | 10000 | Office |
Huizhou TSINGHUA TONFANG | FS662 600*600 | 35mm | Steel infill with cement | 30000 | Office |